国产国拍亚洲精品福利_亚洲av永久无码天堂网毛片_思思热99re在线视频_91亚洲老熟女网_成人手机免费在线观看_国产精品色婷婷五月_国产精品人成在线观看1一_亚洲AV乱码一区二区三区臂_丰满少妇被猛烈进入高清播放!_国产精品jizz在线观看下载

Welcome to jiangsu xinpeng jiahe construction technology co., LTD.
  • Scan view mobile phone station

  • Scan public attention number

TEL:+86-0516-83202818

Current position:Home - Case - Industrial construction
Anhui Huainan Luoneng Power Generation Co., Ltd. added dry coal shed grid project
Release time:2020-04-02 10:30:30      The number of clicks:368

The structure of the project is a bolt-and-socket double-layer grid with square pyramid gates, partial three-layer structure, supported on opposite ends of the upper chord. The bearings are fixed in both directions. The lateral span between the bearings is 114m and the longitudinal spacing between the bearings It is 8m, the thickness of the grid is 2.986m, and the total length of the grid is 160m. The ground elevation of this project is ± 0.000m, the base elevation of the support is ﹢ 2.100m, the grid height is 36.6m, and the truss top elevation is ﹢ 43.007m.

洛能鋼構(gòu).jpg

Cases of interest
Previous:Shanxi Hongan Coking Technology Co., Ltd. coal yard closed shed grid project
Next:Anhui Electric Power Co., Ltd. Coal Yard Renovation Project Dry Coal Shed Project

Back to list

Copyright ? 2020 all rights reserved ?Jiangsu Xinpeng Jiahe Construction Technology Co., Ltd.
Platform support:     Design and production: